Skip to content
Divine EnergyGroup

Los Angeles County · SCE

Solar Panel Installation in Hawthorne, CA

Hawthorne's industrial corridor and small-lot residential sit side by side, and both benefit from SCE rates that make even a compact array worth installing.

We are based in Northridge, 24 miles away, and we design Hawthorne systems around Southern California Edison’s actual rate structure rather than a national average. Permits go through City of Hawthorne. Roofs here are typically composition shingle and flat commercial, which determines the mounting hardware we quote.

Hawthorne at a glance

Electric utility
SCE
Southern California Edison
Peak sun hours
5.5 hrs/day
Annual daily average
Permitting authority
City of Hawthorne
Los Angeles County
Export credit
~$0.05/kWh
NEM 3.0 net billing
SGIP battery rebate
Available
SCE customers may qualify
From our shop
24 miles
Northridge, CA

A typical Hawthorne project

What a $300 bill looks like after

Modeled on SCE’s approximate $0.36 per kWh and 5.5 peak sun hours a day in Hawthorne. Your own numbers will differ — this is the shape of the answer, not a quote.

System size
6.2 kW
~14 panels
Annual production
9,893 kWh
after standard derating
Annual savings
$3,193
at today's rates
Simple payback
11.0 yrs
$97,355 over 25 years

SCE in plain language

Highest rates in the service area and the toughest export credits — which is exactly why a battery pays for itself fastest here. SCE customers also fund SGIP, so storage rebates are on the table.

You buy at

$0.55

peak, 4–9pm

You sell at

$0.05

exported surplus

That gap is the entire argument for storage in Hawthorne. A battery lets you use your own midday production during the expensive evening window instead of selling it for a fraction of what you will pay to buy it back.

Run your own numbers

Pre-set for Hawthorne

Already loaded with SCE rates and 5.5 peak sun hours. Move the slider to your bill.

Step 1

$320/ month
$60$900+

Step 2

Who bills you?

Step 3

Your estimate

A Hawthorne system

Bill offset89%
Today$320
With solar + battery$35

System size

6.6 kW

~15 panels

Saved per year

$3,422

at today's rates

Estimated cost

$36,645

solar + storage, installed

Payback

10.7 yrs

$105,418 over 25 yrs

Why the battery matters here. SCE runs NEM 3.0 net billing, which pays about $0.05 for a kilowatt-hour you export but charges up to $0.55 to buy one back at 6pm. Storing your own production instead of selling it adds roughly $1,676 a year on this bill. SGIP storage rebates may also apply in this territory.

Get this modeled on your real bill
Show the assumptions

Usage derived from $320/mo at SCE’s ~$0.36/kWh blended rate, giving 10,667 kWh a year.

Production at 5.5 peak sun hours a day with a 0.80 derate for inverter, wiring, soiling and heat losses: 10,600 kWh a year.

Self-consumption assumed at 88% of production; the remainder is exported at $0.05/kWh.

25-year figure compounds utility rates at 4.5% a year and degrades panel output 0.5% a year, net of system cost. Planning estimate only, not a quote.

Hawthorne questions

Answered with local numbers

Specific to Hawthorne, SCE, and City of Hawthorne.

How much does solar cost in Hawthorne?

A typical Hawthorne home paying around $300 a month to SCE needs roughly a 6.2 kW system, which lands near $19,712 installed before storage. Adding the 13.5 kWh battery we would normally pair with it brings the project to about $35,237. Roof type matters here: composition shingle and flat commercial is what we mostly see in Hawthorne, and that affects mounting hardware and labor.

Is solar worth it in Hawthorne with SCE?

Highest rates in the service area and the toughest export credits — which is exactly why a battery pays for itself fastest here. SCE customers also fund SGIP, so storage rebates are on the table. At 5.5 peak sun hours a day, a 6.2 kW array in Hawthorne produces roughly 9,893 kWh a year. Against SCE's approximate $0.36 per kWh, that is around $3,193 of annual value, putting simple payback near 11.0 years.

Who issues solar permits in Hawthorne?

Permits for Hawthorne go through City of Hawthorne, and interconnection is handled separately by Southern California Edison. Those are two different clocks and they do not run in parallel by default. We file both and chase the corrections, which is usually where projects stall when homeowners manage it themselves.

Do you install batteries in Hawthorne?

Yes, and Hawthorne sits in SCE territory, so SGIP storage rebates may apply. Because SCE runs NEM 3.0 net billing, exported power earns roughly $0.05 per kWh while peak power costs up to $0.55 — storing your production rather than selling it is where the return comes from here.

How far is Hawthorne from your Northridge shop?

About 24 miles. We serve Hawthorne regularly and batch projects in the area to keep mobilization costs off your invoice.

Ready for a Hawthorne system design?

Send us one SCE bill. We will come back with a layout, a production model, and a real number.

Get my free design